From 52bad64d95bd89e08c49ec5a071fa6dcbe5a1a9c Mon Sep 17 00:00:00 2001 From: David Howells Date: Wed, 22 Nov 2006 14:54:01 +0000 Subject: WorkStruct: Separate delayable and non-delayable events. Separate delayable work items from non-delayable work items be splitting them into a separate structure (delayed_work), which incorporates a work_struct and the timer_list removed from work_struct. The work_struct struct is huge, and this limits it's usefulness. On a 64-bit architecture it's nearly 100 bytes in size. This reduces that by half for the non-delayable type of event. Signed-Off-By: David Howells --- include/linux/nfs_fs_sb.h | 2 +- 1 file changed, 1 insertion(+), 1 deletion(-) (limited to 'include/linux/nfs_fs_sb.h') diff --git a/include/linux/nfs_fs_sb.h b/include/linux/nfs_fs_sb.h index 7ccfc7ef0a83..95796e6924f1 100644 --- a/include/linux/nfs_fs_sb.h +++ b/include/linux/nfs_fs_sb.h @@ -51,7 +51,7 @@ struct nfs_client { unsigned long cl_lease_time; unsigned long cl_last_renewal; - struct work_struct cl_renewd; + struct delayed_work cl_renewd; struct rpc_wait_queue cl_rpcwaitq; -- cgit v1.2.2