aboutsummaryrefslogtreecommitdiffstats
path: root/kernel/sched.c
diff options
context:
space:
mode:
authorSteven Rostedt <srostedt@redhat.com>2008-01-25 15:08:06 -0500
committerIngo Molnar <mingo@elte.hu>2008-01-25 15:08:06 -0500
commit4fd29176b7cd24909f8ceba2105cb3ae2857b90c (patch)
tree2d83445de1d500cd3794a73e6d9d35b44444e259 /kernel/sched.c
parente8fa136262e1121288bb93befe2295928ffd240d (diff)
sched: add rt-overload tracking
This patch adds an RT overload accounting system. When a runqueue has more than one RT task queued, it is marked as overloaded. That is that it is a candidate to have RT tasks pulled from it. Signed-off-by: Steven Rostedt <srostedt@redhat.com> Signed-off-by: Ingo Molnar <mingo@elte.hu>
Diffstat (limited to 'kernel/sched.c')
0 files changed, 0 insertions, 0 deletions