aboutsummaryrefslogtreecommitdiffstats
diff options
context:
space:
mode:
authorJohannes Berg <johannes@sipsolutions.net>2009-10-31 11:15:39 -0400
committerJohn W. Linville <linville@tuxdriver.com>2009-11-04 18:44:48 -0500
commit7fdad987d63f02c8fba30276ba395ac8dc93b719 (patch)
tree06d50ad675b48b9aa9f220d1fba9102b19cac168
parent5b9482dda6dda11dc7050ffa5b4ebfb0c775880f (diff)
cfg80211: remove dead variable
commit 211a4d12abf86fe0df4cd68fc6327cbb58f56f81 Author: Johannes Berg <johannes@sipsolutions.net> Date: Tue Oct 20 15:08:53 2009 +0900 cfg80211: sme: deauthenticate on assoc failure accidentally introduced a dead variable, I had changed the code to not need it while creating the patch and it looks like I forgot to remove the variable (and nobody else noticed either). Signed-off-by: Johannes Berg <johannes@sipsolutions.net> Signed-off-by: John W. Linville <linville@tuxdriver.com>
-rw-r--r--net/wireless/mlme.c2
1 files changed, 0 insertions, 2 deletions
diff --git a/net/wireless/mlme.c b/net/wireless/mlme.c
index 83c2a288dc63..2610b746effa 100644
--- a/net/wireless/mlme.c
+++ b/net/wireless/mlme.c
@@ -62,7 +62,6 @@ void cfg80211_send_rx_assoc(struct net_device *dev, const u8 *buf, size_t len)
62 u8 *ie = mgmt->u.assoc_resp.variable; 62 u8 *ie = mgmt->u.assoc_resp.variable;
63 int i, ieoffs = offsetof(struct ieee80211_mgmt, u.assoc_resp.variable); 63 int i, ieoffs = offsetof(struct ieee80211_mgmt, u.assoc_resp.variable);
64 struct cfg80211_internal_bss *bss = NULL; 64 struct cfg80211_internal_bss *bss = NULL;
65 bool need_connect_result = true;
66 65
67 wdev_lock(wdev); 66 wdev_lock(wdev);
68 67
@@ -97,7 +96,6 @@ void cfg80211_send_rx_assoc(struct net_device *dev, const u8 *buf, size_t len)
97 WARN_ON(!bss); 96 WARN_ON(!bss);
98 } else if (wdev->conn) { 97 } else if (wdev->conn) {
99 cfg80211_sme_failed_assoc(wdev); 98 cfg80211_sme_failed_assoc(wdev);
100 need_connect_result = false;
101 /* 99 /*
102 * do not call connect_result() now because the 100 * do not call connect_result() now because the
103 * sme will schedule work that does it later. 101 * sme will schedule work that does it later.